PROJEcTS - INDUSTRIAL - project management - PMC

Photo
Mining - PFS – IRON ORE DSO – LIBERIA
 Project:  Western Cluster Limited, Liberia

Description:  Pre-feasibility study project for Western Cluster Limited, Liberia.  Building of the equipment required for the production of the DSO (Direct Shipping Ore) iron mine, for the concentration of the ore, its loading, multiple road accesses, the off-loading station and the improvement of the harbour facilities;

Role: Project management Management including the engineering, planning and cost estimation of the project construction.
​
Client: Western Cluster Limited, Liberia
Location: Liberia
Realisation: 2011
Photo
SO2 and of the sulphuric acid mist removal 
Project:  Kronos, Prefaisability – Capture SO2 et H2SO4

Description: Amélioration du système d’enlèvement du SO2 et des brouillards d’acide sulfurique provenant de la digestion de l’oxyde de titane

Management of the feasibility study project for the improvement of the SO2 and of the sulphuric acid mist removal system resulting from the digestion of titanium oxide.

Modeling of the atmospheric emissions of SO2 and sulphuric acid mist, scrubber, electrostatic precipitator, addition of caustic soda and size increase of the waste water treatment system;

Role: Project Management including the engineering, planning and cost estimation of the project construction. 
​
Client: Kronos,
​
Localisation: Varennes, Quebec, Canada
Realisation: 2012
​
Photo
Iron Mine - PFS - Fire Lake 
Project: Fire Lake, Quebec, Canada

Description: New Iron Concentrator for ArcelorMittal at Fire Lake, Quebec, Canada including Autogenous mill (AG Mill), two lines of sifting and of gravity separation, two lines of spiral separators, a silica reduction plant, filters and a train loading system. Also, responsible for the studies related to the dehydration of the mining tailings, the tailings site located at 16 km from the concentrator, the pumping station and the two pressure boosting stations; 

Role : Engineering management, responsible for all disciplines related to pre-feasibility study of the FEL2 type (Front End Loading or Pre-Planning Project) including the engineering, planning and cost estimation of the project construction.

Client:            ArcelorMittal Mines Canada
Location:       Fire lake , Québec, Canada
Realisation:   2010
Photo

​Usine d'éthanol à base de maïs

​Project: Greenfield Ethanol inc

​Description: Construction d’une usine de transformation de Maïs en ethanol.

Role: Direction de l’ingénierie  – IAGC/ EPCM Responsable pour les disciplines d’ingénierie civil, Béton, Structure, Mécanique, Tuyauterie, électricité et Instrumentation;

Client: Greenfield Éthanol inc
Construction Cost: 108 M$

Location: Varennes, Québec
Realisation: 2005-2006